04-10-2013, 10:28 AM
Strike when the Iron is SOFT :D
Soft meaning the ground is very soft with the thaw and all this rain, well its time to run gas line and electrical to my 2nd garage ( ill guess 30' - 40' total ) I want to do this per code for depths and separation as well.
I will be using a cutter/puller just like WE energy does, I will be using the polly type gas line material and as suggested ( maybe dave can chime in ) from our electrician some Gray heavy duty UF 4 wire, Nuteral Nuteral Common and Ground so IF I every want a 220 box outside I can.
Through my accounts I can get everything and almost anything, so if you have other recommendations I'm all ears
Soft meaning the ground is very soft with the thaw and all this rain, well its time to run gas line and electrical to my 2nd garage ( ill guess 30' - 40' total ) I want to do this per code for depths and separation as well.
I will be using a cutter/puller just like WE energy does, I will be using the polly type gas line material and as suggested ( maybe dave can chime in ) from our electrician some Gray heavy duty UF 4 wire, Nuteral Nuteral Common and Ground so IF I every want a 220 box outside I can.
Through my accounts I can get everything and almost anything, so if you have other recommendations I'm all ears