PDA

View Full Version : Machine work done



GRAMPS SS
11-29-2011, 09:35 PM
Well machine work is done and ready to be put back together and then mystery intake gets put on and installed in the Dustpan..car should be running in 4 weeks...just a little ole small block

Prince Valiant
11-29-2011, 09:37 PM
Details man! Details!

GTSLOW
11-29-2011, 10:06 PM
Well machine work is done and ready to be put back together and then mystery intake gets put on and installed in the Dustpan..car should be running in 4 weeks...just a little ole small block

Sweet! Get a deal on some snow slicks?

GRAMPS SS
11-30-2011, 03:18 PM
Just a LITTLE SMALL BLOCK 340 STROKER
.030 over
Eagle 4'' stroke steel crank
H beam rods
Forged flat top 11.1 pistons
Hydraulic roller cam 570/240
COMP CAMS roller lifters
Eldelbrock RPM heads completely tore apart and reworked
1.6 roller rockers
MILODON oil pan.....

and for grins and giggles a MILODON Gear Drive for the fun of it...

Prince Valiant
11-30-2011, 03:34 PM
Just a LITTLE SMALL BLOCK 340 STROKER
.030 over
Eagle 4'' stroke steel crank
H beam rods
Forged flat top 11.1 pistons
Hydraulic roller cam 570/240
COMP CAMS roller lifters
Eldelbrock RPM heads completely tore apart and reworked
1.6 roller rockers
MILODON oil pan.....

and for grins and giggles a MILODON Gear Drive for the fun of it...it should be a screamer!

Ricky Bobby
11-30-2011, 04:48 PM
can u handle all that powa :)

Waver
11-30-2011, 04:54 PM
Remember, it is a showcar, not a race car. Wayne, are you going to change your name to ProsShowDuster?