02-25-2007, 11:09 PM
My work is moving into our new building in the next month or so. Everything is being updated and more organized.
When we install a new A/C outside we like to throw down two 5 gal. buckets of pee gravel. Then place the pad on top of that, easy to level and look better then just throwing on top of the dirt/grass.
Right now the Pee Gravel is just in the back of our current shop on the ground, half of it is kicked away or just scatterd about.
I would like to weld up or maybe find somthing out on the .net that holds allot of gravel and has some sort of trap door where we can slide a bucket underneith and fill er' up :thumbsup
Any thoughts or idea would be great.
- Brad -
When we install a new A/C outside we like to throw down two 5 gal. buckets of pee gravel. Then place the pad on top of that, easy to level and look better then just throwing on top of the dirt/grass.
Right now the Pee Gravel is just in the back of our current shop on the ground, half of it is kicked away or just scatterd about.
I would like to weld up or maybe find somthing out on the .net that holds allot of gravel and has some sort of trap door where we can slide a bucket underneith and fill er' up :thumbsup
Any thoughts or idea would be great.
- Brad -